POSC Specifications Version 2.2 Epicentre Logical Data Model

DERRICK_FLOOR_REFERENCE

(Rules) (Express)

The function of the derrick floor or a drilling rig serving as datum for position measurements along a wellbore.


Local rules:

Entity consolidated into table WELLBORE_REF.

Referenced in Diagrams:


Generated on Mon Dec 1 10:00:02 1997
© Copyright 1997 POSC. All rights reserved.