|
May 13, 2005
Shell E&P Facility
200 No. Dairy Ashford
Conf. Room WCK-6297 Houston, Texas USA
Meeting Hosted
by Shell E&P
|
This
was an informal regional POSC Special Interest
Groups (SIGs) meeting. The meeting was designed to be valuable to those who are active participants in one or more
SIGs, as well as for those who would
like to learn more about work of the SIGs and the associated
industry standards.
Highlights addressed included:
- Data Store Solutions (DSS) SIG:
- Working toward an industry
standard for Lithology reference names
- Working toward a freely
accessible Well Identity Service to achieve consistent use of well and
wellbore identifiers
- Working to achieve consistent
use of geodetic and coordinate reference standards
- Practical Well Log Standards (PWLS)
SIG:
- Addressing current change
requests for joined and interpreted curve mnemonics
- Working toward expanding the
coverage and use of the standards
- Unifying XML data transfer
standards for wireline and LWD data
- Integrated Operations (IntOPS)
SIG:
- Working toward an industry
standard for data transfers of Distributed Temperature Survey data
- Working toward an industry
standard for production volume and related data in support of
optimization and reporting
Attendees participated in one or more of
the meeting sessions according to their areas of interest.
Presentation material, as provided by
the speakers, can be accessed via links in the agenda.
If you would like further information about these subjects,
please visit contact Alan Doniger, Paul
Maton or Struby Overton at POSC.
A similar set of meetings were held April 4 in Aberdeen and
April 6 in Stavanger. The semi-annual WITSML SIG
meetings and public seminar was held on May 10-12 in Houston.
|
|
Friday, May
13
Agenda
|
| 08:30
|
Registration
|
|
09:00
|
Data
Store Solutions (DSS) SIG:
-
Overall
Welcome and Introduction, Alan Doniger, POSC (PowerPoint File,
168 KB)
-
DSS
SIG Introduction, Alan Doniger (PowerPoint File, 262 KB)
-
Global
Unique Well Identifier Initiative Update, Scott Woolcock, Shell
(PowerPoint File, 249 KB)
-
Corporate
Data Store Update, Landmark, Paloma Urbano, Landmark (PowerPoint
File, 2.0 MB Large File)
-
Coordinate
Reference Systems Standards Update, Paul Maton, POSC (PowerPoint
File, 108 KB)
-
Lithology
Reference Standards Update, Paul Maton. 205 KB)
-
Well
Path Data Transfer Standards Update, Paul Maton (PowerPoint
File, 144 KB)
|
|
10:30
|
Practical
Well Log Standards (PWLS) SIG:
|
|
11:30
|
Lunch
|
|
12:30
|
Integrated
Operations (IntOPS) SIG:
|
|
|
Afternoon
Break
|
14:30
|
Integrated
Operations (IntOPS) SIG (cont'd.):
-
Production
Data Transfer Standards (cont'd.)
- Supplier Viewpoints
- Merrick
Systems, Kemal Farid (PowerPoint File, 82 KB)
- Sense
Intellifield, Bill Chmela
- Roxar,
John Sauri (PowerPoint File, 8.2 MB Large
File)
- Weatherford,
Thomas Koithan (PDF File, 423 KB)
- Draft
WITSML Production Standards, David Archer (POSC)
-
Open
Dialogue
|
|
16:15
|
Adjourn
|
|