POSC Integrated Operations (IntOps) Sig MeetingRegistration Information |
|||||||||||||||||||||
|
October 20, 2006
|
This was a meeting of POSC's Production
Special Interest Group.
The meeting was open to all persons interested in information standards associated with upstream production operations. The meeting featured invited presentations and open discussions about current collaborative projects, including the results from the PRODML [Optimization] Work Group, Integrated Information Platform (IIP) and Norway's deployment of the WITSML Production Reporting Standards. POSC described the current specification development work in this area. Available presentation material may be accessed via links in the agenda below. |
||||||||||||||||||||
|
|
|||||||||||||||||||||
|
|
|||||||||||||||||||||
|
Agenda |
|
||||||||||||||||||||
Send questions and comments to webmaster@posc.org.
Copyright © 1994-2006 Petrotechnical Open Standards Consortium, Inc. All rights
reserved.
POSC ®, the POSC logo ® and Epicentre ® are registered trademarks of
Petrotechnical Open Standards Consortium.
WITSML™, the WITSML logo™, PWLS™, and IntOPS™ are trademarks of
Petrotechnical Open Standards Consortium.