PPT Slide
An E&P study consists of building a Shared Earth Model to obtain, for example, a production profile.
Sharing Links Between Objects
- Saves the re-interpretation time at each step of the E&P process
- Is safer because the interpretation is done by the expert
- At each step of the interpretation we can go back to solve a consistency problem